QR code

The St Astier Blog – all the latest news on our specialist repair schemes and related activities brought to you with a hefty dose of insight into the inner workings of our humble company.

New Case Study: The Theatre Royal

New Case Study: The Theatre Royal

The Theatre Royal reopened its doors on the 12th September to once more delight the region's public following a six month period of works to restore the internal splendour of ‘The Grand Old Lady of Grey Street'. The £4.9million scheme also made provision for the careful repair and conservation of the theatre's external façade, particularly to the front elevation with its imposing portico entrance. St Astier was instructed to carry out this sensitive aspect of works which comprised stone indentation, mortar based repairs, re-pointing, limited gentle cleaning and removal of bird guano. To mark the reopening of the Grade I listed theatre in time for its 175th birthday next year, we have now released our six page case study detailing the external repair and conservation works.

Download the Theatre Royal Case Study